Field Investigation of the Dynamic Response of Culvert-Embankment-Culvert Transitions in a High-Speed Railway

高速铁路涵洞-路堤-涵洞过渡段动力响应现场调查

阅读:1

Abstract

The stiffnesses of embankments and culverts differ in the transition sections of high-speed railways (HSRs) due to their different supporting conditions. The dynamic irregularity caused by the different stiffnesses makes this transition area the weakest part of high-speed railways. Graded crushed stone combined with 5% cement is typically used to fill the subgrade in these transition areas. Thus, three different particle size ratios of crushed stone were matched and tested regarding the construction parameters to explore the most suitable materials to fill the roadbed in a transition section. Then, field dynamic tests were carried out on the culvert-embankment-culvert transition area where trains run at speeds of 5-360 km/h. A time-domain analysis of the test data was performed to obtain the laws of variation that cause the dynamic characteristics to change with the railway line and roadbed layer and the changes induced by a train's running speed, operating direction, and axle weight. The results indicate that (i) it is feasible to fill transition section roadbeds with well-graded crushed stone combined with 5% cement with optimal water contents; (ii) extreme dynamic responses in some special sections are observed, suggesting the value of taking special measures at the transition section. For example, the sections 14.5 m and 30 m from the 679 culvert and the bed layer should be specially stabilized; (iii) the train's axle load and driving direction show a great effect on corresponding sections and layers but present a small effect on the sections and layers nearby; and (iv) 260 km/h is a critical speed.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。