Optimization of production system of shale oil development in Ordos basin, China

中国鄂尔多斯盆地页岩油开发生产系统的优化

阅读:1

Abstract

In this paper, production system (PS) of shale oil is optimized according to production data and indoor experiments, including core and fluid tests. Results showed that: ① Pressure drop rate at wellhead is a reasonable reference for the determination of post-fracture shut-in duration (PFSID). When pressure at a wellhead of horizontal well is relatively stable and the pressure drop less than 0.1 MPa per day for three consecutive days, PFSID ends; ② Flowback intensity of fracturing fluid affects the effectiveness of proppant underground, thus flowback intensity can be determined by the critical flow rate and safety factor of each proppant; ③ Flowback intensity should be varied during different development stages, which could be divided into four according to production gas and oil ratio(GOR) of a shale oil horizontal well: low, medium-high, high and high-low production GOR. During the stage of low production GOR, ratio of flow pressure and saturation pressure should be maintained greater than 1.0, and the initial daily liquid productivity for a hundred-meter oil-bearing lateral length in a horizontal well is 2.4 ~ 2.9 m(3)/d; and during the medium-high production GOR, high production GOR and high-low production GOR stages, the responding initial daily liquid productivity should be maintained between 0.8 ~ 1.0 or less than 0.8 respectively.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。