Deficiencies causes in road construction scheduling: Perspectives from construction professionals

道路施工进度安排中的缺陷原因:来自建筑专业人士的视角

阅读:1

Abstract

Effective construction scheduling is crucial for the success of road projects. However, deficiencies in this scheduling can lead to significant challenges such as delays, cost overruns, and litigation. Therefore, project managers need to understand the causes that contribute to these deficiencies thoroughly. Unfortunately, there has been little research examining these elements in detail. To address this gap, this study examined the causes that affect the scheduling of construction processes for road projects. The research method involved four stages: (1) identification of causes affecting construction scheduling, (2) design and application of a questionnaire, (3) influence analysis, and (4) exploratory quantitative analysis. The study identified 34 causes of deficiencies in the scheduling of road construction processes in six categories: workforce, machinery, material, measurement, environment, and method. Thirty-two experts were consulted to evaluate the frequency and severity of each cause based on a relative influence index. The causes with the greatest impact on deficiencies in road construction scheduling were poor estimation of labor performance, poor estimation of workforce quantity, and deficient coordination with public utilities. The findings allow managers to pinpoint the root causes of road construction planning problems and identify effective solutions.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。