Improving the efficiency and reliability of India's power grid through targeted EHV transmission line investments: a case of UPPCL

通过有针对性的特高压输电线路投资,提高印度电网的效率和可靠性:以北方邦电力公司为例

阅读:1

Abstract

This study analyzes the optimization of Extra High Voltage (EHV) transmission line design parameters by Uttar Pradesh Power Corporation Limited (UPPCL) in India to improve power grid efficiency and reliability. UPPCL reduced insulation specifications for 400 kV lines from 27 to 21 disc insulators and decreased live metal clearance from 2600 to 2400 mm, resulting in 7-9% cost savings per line and reduced right-of-way requirements. While initial test lines performed satisfactorily for over 5 years, longer lines experienced operational challenges related to insulator quality, bird activity, and design margins. Tripping issues emerged during adverse weather conditions, particularly in foggy winter periods. Root cause analysis revealed the need for stringent insulator quality control, regular cleaning to mitigate bird dropping contamination, and potential corona ring design improvements. This case study demonstrates how targeted EHV transmission line optimization can yield significant cost and environmental benefits, while highlighting the importance of balancing economic gains with reliability and safety considerations. The findings provide valuable insights for future EHV transmission line designs and upgrades across India's power grid.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。