Engineering-geological study of relationships between soil and rock workability, type and volume of excavated materials, and earthwork costs (six case studies)

土石可加工性、开挖材料类型和体积以及土方工程成本之间关系的工程地质研究(六个案例研究)

阅读:2

Abstract

The engineering-geological study deals with the study of significance and relationship of soil and rock workability (factor representing the engineering-geological structure of rock massif) and the remaining earthwork parameters influencing the cost of construction work, such as excavation type and its technology, and excavated cubic volume. The comparative tool was the cost of earthwork as it reflects the real value of the given parameters during the implementation of earthwork. Soil and rock workability is the most important parameter of rock massif engineering-geological structure during any earthwork. The investor pays the contractor for earthwork based on workability classes which have their accounting value expressed as a volume unit of earthwork per particular project. The research results arise from a comparison of 6 sewer system construction project case studies in the north-east of the Czech Republic. The research shows that the most important factor during the implementation of earthwork is the specific engineering-geological structure (52%), which reflects in the parameter of soil and rock workability classes, using which all earthwork is priced. The second most important factor (33%) is the type of excavation and its technology. The least important is the excavated cubic volume (15%), which means the overall cubic volume of earthwork. The results were obtained within three evaluation approaches, where the comparison unit was one cubic meter of excavated volume during earthwork.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。