On-site workshop investment problem: A novel mathematical approach and solution procedure

现场车间投资问题:一种新的数学方法和求解程序

阅读:1

Abstract

In real-world construction sites, On-Site Workshops (OSW) are installed to accelerate construction activities and facilitate the material handling process. These temporary OSWs are cost-effective, leading to decreasing the material handling cost and project makespan, which indicates their important role as a part of a construction project. However, considering the OSW, which has not been addressed in the project scheduling problems, requires the construction site to have a space capacity constraint while considering the workshop size, availability level, and other project-related constraints. In the present work, by considering the OSWs, a real construction project scheduling problem is studied as a Multi-Mode On-Site Workshop Investment Problem with Tardiness (MOSWIPT) while finding the installation/dismantling time of the OSWs. Two new (linear) mathematical programming models are proposed for MOSWIPT. Next, due to the NP-hardness of the problem, an enhanced Genetic Algorithm (GA)-based metaheuristic with efficient problem-specific improvement rules as local search and effective crossover and mutation operators is proposed. Computational experiments show that the proposed method has solved most of the instances of the addressed problem to optimality and outperformed the existing metaheuristics, e.g., Simulated Annealing (SA) and Particle Swarm Optimization (PSO). Finally, conclusions and suggestions for future studies are stated.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。