Study on physical clogging process and practical application of horizontal subsurface flow constructed wetland

水平潜流人工湿地物理堵塞过程研究及实际应用

阅读:1

Abstract

In view of the urgent concerns pertaining to the proliferation of rural wastewater discharges and the imperative for decentralized treatment, this article examines the phenomenon of physical clogging in a small-scale horizontal submerged flow artificial wetland system. Through a combination of experimental analysis and CFD-EDM numerical simulations, the impact of clogging on the hydraulic efficiency of the system was subjected to rigorous examination. Based on these findings, an innovative design strategy was proposed, namely the addition of vertical baffles. The experimental results demonstrate that this strategy can markedly prolong the duration of complete clogging of the system by up to 15% and enhance the hydraulic efficiency by 21%. Based on this, a small-scale horizontal submerged artificial wetland wastewater treatment system was designed for rural areas and successfully implemented in Fanrong Village, Rui'an City. This resulted in an enhanced wastewater treatment effect and an improved rural landscape. The findings of this study contribute to the development of a more rational and effective sewage treatment solution for rural areas.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。