Railway track settlement patterns and control measures for multi-tunnel construction underneath a station track group: a case study

车站轨道群下多隧道施工的铁路轨道沉降模式及控制措施:案例研究

阅读:1

Abstract

This paper is based on the proximity engineering project of the Baishiyi tunnel group passing under the Chongqing West Station track group. Considering the train load and the spatial relationship of the tunnel and track groups, the settlement patterns, horizontal displacement, and differential settlement of the tunnel-strata-tracks system during the excavation process are studied through theoretical calculations and numerical simulation methods. The results indicate that the tunnel vault, strata, and track settlement deformation patterns are similar. Throughout the tunnel construction process, the tracks underwent uplift, settlement, and eventually stabilized. The settlement trough formed by the excavation of the three tunnels below the track group has an impact range of 25-145 m. Between 35 and 75 m, the differential settlement of the double track gradually increases with excavation. As the tunnel face reaches 75 m, the track differential settlement gradually converges and tends to stabilize. To minimize the impact of underpass tunnel construction on track groups, it is recommended to use a combination of full-section hole grouting and surface reinforcement grouting for ground reinforcement. Additionally, optimizing the construction parameters, including the step length and primary support closure time, and strengthening the locking anchor can further reduce the impact.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。