Automated quantity take-off in a Norwegian road project

挪威道路项目中的自动化工程量清单

阅读:1

Abstract

Automated quantity take-off from digital models in road projects has many benefits. In real project settings, however, it seems rarely to take place. This paper investigates automated quantity take-off in a real-life road project and the experiences from this automation. A literature and a document study were performed. 48 domain models serialized in IFC 2 × 3 were then analyzed before 10 project members were interviewed. The quantity take-off was automated to harvest classified quantities to a specification of work. The automated quantity take-off was reproducible at revisions for 40% of the cost items. However, the transferability of the procedures to other use cases than the specification of work is questionable because of the applied cost breakdown structure. The findings suggest three practical improvements for automated quantity take-off in road projects. The three include (1) using unambiguous classes assembled in an ontology, (2) avoiding hard coding of cost breakdown structures in authoring tools, and (3) implementing the Level of Information Need (LOIN) to improve reusability across project phases and use cases. The quantity take-off and experiences are assessed from the designer's perspective. The client's and contractor's perspectives were out of this paper's scope.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。