Improving power ramp rate of a coal-fired power plant by a bypass steam accumulator

通过旁路蒸汽蓄能器提高燃煤电厂的功率爬坡速率

阅读:2

Abstract

The increasing penetration of high-volatility renewable energy sources in the power system presents higher demands for flexibility from coal-fired power plant (CFPP). To enhance the flexibility of CFPPs, researchers have conducted a significant amount of thermal-system-level research in recent years on increasing system peak shaving depth. However, the load ramp rate of CFPPs under deep peak shaving is rarely discussed, despite its significance to the overall flexibility performance of CFPPs. This paper proposes a steam accumulator storage system integrating to the turbine's bypass system. The steam accumulator charges directly with working fluid from the live steam or reheat systems and discharge to the turbine, responding quickly to power ramp commands. A steady state model and a dynamic model of the proposed system were built and validated, and the calculation shows that the proposed scheme provides a load change of +2.13 % Pe and -8.3%Pe during a round-trip with a power efficiency of 63.6 % at a unit load of 40 % THA. The unit's load increase rate under coordinated control was enhanced by 1.5 % Pe/min, reaching 3 % Pe/min, using the proposed steam accumulator without revising the original controls, and the load decrease rate reached at least 5 % Pe/min. The results indicate that the proposed system provides a straightforward, easy-to-implement, and efficient solution for enhancing the load ramp rate of CFPPs at low loads.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。