日期:
2020 年 — 2026 年
2020
2021
2022
2023
2024
2025
2026
影响因子:

Implementation of extreme collaboration methodology in a Capstone project course

在毕业设计课程中实施极限协作方法

Forcael, Eric; Cifuentes, Luis; Nope, Alberto; Garcés, Gonzalo; Casanello, Federico; Díaz-Lantada, Andrés

Fixed start method for repetitive project scheduling with simulated annealing

采用模拟退火算法的重复项目调度固定起始方法

Moreno, Francisco; Forcael, Eric; Orozco, Francisco; Baesler, Felipe; Agdas, Duzgun

Assessing Feed-Forward Backpropagation Artificial Neural Networks for Strain-Rate-Sensitive Mechanical Modeling

评估用于应变率敏感力学建模的前馈反向传播人工神经网络

Tuninetti, Víctor; Forcael, Diego; Valenzuela, Marian; Martínez, Alex; Ávila, Andrés; Medina, Carlos; Pincheira, Gonzalo; Salas, Alexis; Oñate, Angelo; Duchêne, Laurent

Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context

在新冠疫情背景下,通过多目标优化模型评估建筑项目中的劳动力调度效率

Corral, Federico; Forcael, Eric; Linfati, Rodrigo