Impact of hospital process reengineering on door-to-needle time for intravenous thrombolysis in acute ischemic stroke (PROMISE-CHINA): a multicenter prospective pre-post quasi-experimental study
医院流程重组对急性缺血性卒中患者静脉溶栓治疗入院至用药时间的影响(PROMISE-CHINA):一项多中心前瞻性前后准实验研究
期刊:Frontiers in Neurology
影响因子:2.8
doi:10.3389/fneur.2026.1746553
Dong, Dawei; Lu, Longyan; He, Niu; Zhang, Junrun; Wang, Ziran; Xia, Haiqin; Sun, Xuwen; Geng, Yu; Liang, Hui; Niu, Xiaoyuan; Zhang, Meng; Xu, Dongjuan; Li, Ning; Li, Jianhua; Wang, Wanhua; Zhang, Min; Zhang, Zhong; Cao, Yongjun; Sun, Li; Zhou, Junshan; Li, Weirong; Li, Peilan; Fu, Jianhui; Qiu, Wei; Xue, Yanzhong; Liu, Yumin; Zhang, Jinli; Qiu, Weiwen; Xing, Yan; Lu, Zhengqi; Liu, Fuling; Wang, Shixia; Li, Jilai; Zang, Dawei; Liu, Junyan; Feng, Juan; Bao, Zhengshe; Zhang, Suping; Wang, Yongjun; Xin, Xiufeng; Zhu, Huili; Xu, Anding