Economic evaluation of a strategy to shorten the time to surgery with neuraxial anaesthesia compared with usual clinical practice in patients on chronic antiplatelet therapy with a proximal femur fracture

对采用椎管内麻醉缩短手术等待时间的策略进行经济评估,并与长期服用抗血小板药物的近端股骨骨折患者的常规临床实践进行比较。

阅读:3

Abstract

INTRODUCTION: Before implementing a new health care strategy, it is important to assess effectiveness but also to perform an economic evaluation. The goal of the present study was to perform a comparative economic evaluation of a new strategy aimed at using proposed implementation of the Plateletworks guidance (measurement of platelet function) with usual practice (delayed time to surgery) in patients on chronic antiplatelet treatment and scheduled for surgery with neuraxial anaesthesia due to proximal femur fracture. METHODS: This is an economic evaluation carried out alongside a randomised controlled clinical trial at four centres in Spain. Patients were randomised to undergo either early platelet function-guided surgery (experimental group) or delayed surgery (control group). As AFFEcT trial results demonstrated significative difference between groups in the primary efficacy endpoint, the median time to surgery, a cost-effectiveness analysis was performed. Direct costs associated with hospitalisation until one-month post-discharge were considered and measured from a hospital perspective. All costs were reported in euros. Analyses were performed on a per protocol basis. Effectiveness outcome measures were the incremental cost and incremental cost per reduction in days to surgery. A deterministic sensitivity analysis was implemented to quantify uncertainty. RESULTS: A total of 156 patients were randomized to the two groups (n = 78 per group). A total of 143 patients were included in the per protocol population (75 and 68 patients in the experimental and control groups, respectively). The median time to surgery was 2.30 days (IQR: 1.53-3.73) in the experimental group and 4.87 days (4.36-5.60) in the control group (a reduction of 2.40 days). Total costs during the 1-month study perioperative period were higher in the delayed surgery group (€18,495.19) than for the early surgery group (€16,497.59). The incremental cost was negative (€1,997.60), a statistically significant difference (P < 0.05). As measured by the reduction in time (days) to surgery, the incremental cost-effectiveness ratio (ICER) for early surgery was negative (777.28€/day). Sensitivity analysis demonstrated consistent cost saving. CONCLUSION: For patients on chronic antiplatelet treatment scheduled to undergo surgery for proximal femur fracture, an individualised strategy guided by a platelet function testing is a cost-saving and cost-effective strategy.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。