Investigating supply chain challenges of public sector agriculture development projects in Bangladesh: An application of modified Delphi-BWM-ISM approach

孟加拉国公共部门农业发展项目供应链挑战调查:改进的德尔菲-BWM-ISM方法的应用

阅读:1

Abstract

This study aims to investigate the supply chain challenges of public sector agriculture development projects in Bangladesh using the modified Delphi, Best Worst Method (BWM), and Interpretive Structural Modelling (ISM) methods. Based on these three widely acclaimed statistical techniques, the study identified, ranked, and identified interrelationships among the challenges. The study is unique not only in terms of research findings, but also in terms of methodology, as it is the first to use the three MCDM (Multicriteria Decision Making) tools to examine supply chain issues in public sector agriculture development projects in a developing country context. A literature review and two modified Delphi rounds with 15 industry experts' opinions were applied to identify and validate a list of 11 key supply chain challenges. To determine the priority of the challenges, a panel of eight industry experts was consulted, and their responses were analysed using the BWM. Then, another group of 10 experts was consulted using ISM to investigate the contextual relationships among the challenges, resulting in a five-layered Interpretive Structural Model (ISM) and MICMAC (cross-impact matrix multiplication applied to classification) analysis of the challenges. According to relative importance (global weights), "improper procurement planning (0.213), "delay in project initiation (0.177), "demand forecasting error (0.146)", "lack of contract monitoring mechanism (0.097)", and "lack of competent staff (0.095)" are the top five ranked key challenges that have a significant impact on the project supply chain. Regarding contextual relationships, the ISM model and ISM-MICMAC analysis identified the "political influence" challenge as the most influential, and also independent of the other challenges. The findings are critical for project managers in managing challenges because understanding both relative importance and contextual relationships are required to address the challenges holistically. Additionally, these findings will benefit policymakers, academics, and future researchers.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。