Optimizing Workover Rig Fleet Sizing and Scheduling Using Deterministic and Stochastic Programming Models

利用确定性和随机规划模型优化修井机队规模和调度

阅读:1

Abstract

We present deterministic and stochastic programming models for the workover rig problem, one of the most challenging problems in the oil industry. In the deterministic approach, an integer linear programming model is used to determine the rig fleet size and schedule needed to service wells while maximizing oil production and minimizing rig usage cost. The stochastic approach is an extension of the deterministic method and relies on a two-stage stochastic programming model to define the optimal rig fleet size considering uncertainty in the intervention time. In this approach, different scenario-generation methods are compared. Several experiments were performed using instances based on real-world problems. The results suggest that the proposed methodology can be used to solve large instances and produces quality solutions in computationally reasonable times.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。