Best possible approximation algorithms for single machine scheduling with increasing linear maintenance durations

针对单机调度问题,考虑线性维护时间递增的情况,最佳近似算法

阅读:1

Abstract

We consider a single machine scheduling problem with multiple maintenance activities, where the maintenance duration function is of the linear form f(t) = a+bt with a ≥ 0 and b > 1. We propose an approximation algorithm named FFD-LS2I with a worst-case bound of 2 for problem. We also show that there is no polynomial time approximation algorithm with a worst-case bound less than 2 for the problem with b ≥ 0 unless P = NP, which implies that the FFD-LS2I algorithm is the best possible algorithm for the case b > 1 and that the FFD-LS algorithm, which is proposed in the literature, is the best possible algorithm for the case b ≤ 1 both from the worst-case bound point of view.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。