The fracture and perforation failure analysis of downhole tubes

井下管断裂和穿孔失效分析

阅读:1

Abstract

:The downhole tubes were fractured and perforated after 5 years of shut-in due to high water cuts. This study employs a comprehensive array of analytical techniques to investigate the mechanisms behind fractures and perforations. Utilizing non-destructive testing (NDT), direct reading spectrometer, tensile strength testing machine, impact testing machine, optical microscope (OM), macroscopic fracture morphology observation, scanning electron microscope (SEM) and energy spectrum analysis (EDS), and sulfide stress corrosion cracking (SSCC) was studied. The reason for the fracture of the tubing is that under the condition of low pH value, high hydrogen sulfide environment, the tubing is fractured due to stress concentration caused by cracks in the outer thread relief groove. The perforation of the inner tube wall was caused by gradual wall thickness reduction under the influence of H(2)S, CO(2), and Cl(-), resulting in fouling and eventual perforation. To prevent tube corrosion during long-term shut-in, it is recommended to inject crude oil or diesel into the well.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。