Determination on Effective Drainage Radius of In-Seam Borehole Based on Gas Content Test and Numerical Simulation Calculation Method

基于含气量试验和数值模拟计算方法确定煤层内钻孔有效泄油半径

阅读:2

Abstract

In order to accurately and efficiently determine the effective drainage radius of the in-seam borehole, the advantages and disadvantages of the current effective drainage radius test methods are analyzed, and the method of combining the gas content field and numerical simulation calculation is proposed to accurately determine the effective drainage radius of the borehole, which is applied in the mine. The results show that the method combining gas content test and numerical simulation calculation has the advantages of a short measurement period and advanced means. The effective drainage radius of the borehole increases rapidly at the initial stage of gas drainage and then gradually slows, eventually reaching a limit value. The relationship between the effective drainage radius and drainage time follows a Langmuir function relationship. When the drainage time exceeds 300 days, the effect of the drainage time on the effective drainage radius becomes relatively small. The average error between the numerical simulation results of effective drainage radius and the field verification results of gas content is 2.2%, which validates the rationality of the constructed coal seam gas-solid coupling model. The research can provide theoretical references for accurately determining and reasonably laying out the effective drainage radius of the bedding borehole in the mining seam of the coal mine, which is of great practical significance for the safety production of the mine.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。