Development of an integrated intelligent BIM-based model for multi-objective optimization in engineering assembly processes

开发基于BIM的集成智能模型,用于工程装配过程中的多目标优化

阅读:1

Abstract

To enhance construction efficiency and economic performance in prefabricated building projects under limited resource conditions, this study proposes an integrated intelligent optimization model based on Building Information Modeling (BIM) semantic representation. The model is designed to generate optimal assembly plans under multi-objective trade-offs, achieving a balanced compromise between shortened construction periods, reduced costs, and minimized resource conflicts. The study begins by constructing an assembly semantic model using the publicly available BuildingNet dataset, extracting key components' geometric structures and spatial topology to establish a data foundation suitable for multi-objective scheduling modeling. A multi-objective particle swarm optimization (MOPSO) algorithm enhanced with a dynamic objective weighting mechanism is then introduced. By allowing flexible prioritization of construction duration, budget cost, and resource usage, the model generates a diverse solution set and provides multiple candidate optimization schemes. Furthermore, a Deep Q-Network (DQN)-based reinforcement learning strategy is integrated to provide real-time feedback on each solution's performance during simulated scheduling, enabling continuous policy updates and adaptive evolution. Experiments conducted on 100 standardized assembly tasks demonstrate the model's effectiveness, producing feasible solution sets under varying objective weights. For a representative configuration, the model achieves an average construction period of 85.2 days, a budget cost of USD 1.486 million, and fewer than 1.7 resource conflict events. Compared with rule-based scheduling models, the Non-dominated Sorting Genetic Algorithm II (NSGA-II), and static MOPSO without feedback mechanisms, the proposed approach outperforms in terms of objective coverage, convergence speed, and solution diversity. It achieves superior results in key metrics, including hypervolume (HV = 0.683), solution spread (Spread = 0.227), and inverted generational distance (IGD = 0.017), validating its robustness and adaptability in complex trade-off scenarios. The findings indicate that integrating semantic modeling, evolutionary optimization, and learning-based feedback offers significant potential for dynamic multi-objective construction optimization, providing effective support for BIM practices oriented toward benefit-schedule-resource coordination.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。