Maximizing projects' profitability, environmental score, and quality: a multi-project scheduling and material ordering problem

最大化项目盈利能力、环境评分和质量:多项目调度和物料订购问题

阅读:1

Abstract

The proper trade-off between various project costs is often disregarded when planning projects. This leads to several detrimental effects, such as inaccurate planning and higher total cost, far more significant in a multi-project environment. To overcome this limitation, this study proposes a combined approach for the multi-project scheduling and material ordering problem (MPSMOP), which maintains the proper trade-off among various costs. Moreover, the environmental impact and project quality objectives are optimized alongside the economic criterion. The proposed methodology involves three stages: (a) quantifying the environmental performance of suppliers; (b) measuring the activities' quality through the Construction Quality Assessment System approach; and (c) building and solving the mathematical model of the MPSMOP. The MPSMOP is modeled as a tri-objective optimization approach aiming to determine project scheduling and material ordering decisions so that the net present value, environmental score, and total quality of implemented projects are maximized simultaneously. As the proposed model comes into the nondeterministic polynomial optimization problem category, two powerful metaheuristics are customized and used to solve the problem. The efficiency of both algorithms was assessed on several datasets. The proposed framework is applied to railway construction projects in Iran as a case study, which presents the validity of the model and the decision-making options provided to managers.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。