Designing a public engagement process for long-term urban park development project

为长期城市公园开发项目设计公众参与流程

阅读:1

Abstract

Gathering public consensus about long-term urban open space development is more difficult than ever, even though public engagement is crucial for sustainable long-term policymaking. Routine evaluation of public awareness is important for retaining project momentum and designing appropriate public engagement processes for the future. This study focuses on the Yongsan Park Development Project, which has been in progress for more than three decades. An online survey of 2,000 respondents was conducted and analyzed to evaluate the current public awareness and ask questions about respondents' expectations for public engagement. The results of this study reveal that 1) a hybrid methodology is needed to effectively approach different age groups; 2) an online survey can offer new insights for projects that repurpose U.S. army base and military sites into urban open spaces; 3) the survey results will enable us to design a better public participation process that is appropriate for post-pandemic society, in which virtual meetings and socially distanced communications are part of the new norm.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。