Built On-orbit Robotically assembled Gigatruss (BORG): A mixed assembly architecture trade study

在轨机器人组装巨型桁架(BORG):混合组装架构权衡研究

阅读:1

Abstract

This paper explores a mixed assembly architecture trade study for a Built On-orbit Robotically assembled Gigatruss (BORG). Robotic in-space assembly (ISA) and servicing is a crucial field to expand endeavors in space. Currently, large structures in space are commonly only deployable and must be efficiently folded and packed into a launch vehicle (LV) and then deployed perfectly for operational status to be achieved. To actualize being able to build increasingly large structures in space, this scheme becomes less feasible, being constrained by LV volume and mass requirements. ISA allows the use of multiple launches to create even larger structures. The common ISA proposals consist of either strut-by-strut or multiple deployable module construction methodologies. In this paper, a mixed assembly scheme is explored and a trade study is conducted on its possible advantages with respect to many phases of a mission: 1) manufacturing, 2) stowage and transport, 3) ISA, and 4) servicing. Finally, a weighted decision matrix was created to help compare the various advantages and disadvantages of different architectural schemes.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。