A Study on Multi-Robot Task Allocation in Railway Scenarios Based on the Improved NSGA-II Algorithm

基于改进NSGA-II算法的铁路场景多机器人任务分配研究

阅读:2

Abstract

With the advent of Industry 4.0, the seamless integration of industrial systems and unmanned technologies has significantly accelerated the development of smart industries. However, the research on task allocation for railway maintenance robots remains limited, particularly with respect to optimizing costs and efficiency within smart railway systems. To address this gap, the present study explores multi-robot task allocation for automated orbital bolt maintenance, aiming to enhance operational efficiency by minimizing both makespan and total travel distance for all robots. To achieve this, an improved hybrid algorithm combining NSGA-II and MOPSO is proposed. Initially, a dynamic task planning method, tailored to the specific conditions of railway operations, is developed. This method uses the coordinates of track bolts to extract environmental features, enabling the dynamic partitioning of task areas. Subsequently, a multi-elite archive strategy is introduced, along with an adaptive mechanism for adjusting crossover and mutation probabilities. This ensures the preservation and maintenance of multiple solutions across various Pareto fronts, effectively mitigating the premature convergence commonly observed in traditional NSGA-II algorithms. Moreover, the integration of the MOPSO algorithm strikes a balance between local and global search capabilities, thereby enhancing both optimization efficiency and solution quality. Finally, a series of experiments, conducted with varying task sizes and robot quantities during the railway maintenance window, validate the effectiveness and improved performance of the proposed algorithm in addressing the multi-robot task allocation problem.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。