Process accident prediction using Bayesian network based on IT2Fs and Z-number: A case study of spherical tanks

基于IT2F和Z数的贝叶斯网络过程事故预测:以球形储罐为例

阅读:1

Abstract

This study aimed to propose a novel method for dynamic risk assessment using a Bayesian network (BN) based on fuzzy data to decrease uncertainty compared to traditional methods by integrating Interval Type-2 Fuzzy Sets (IT2FS) and Z-numbers. A bow-tie diagram was constructed by employing the System Hazard Identification, Prediction, and Prevention (SHIPP) approach, the Top Event Fault Tree, and the Barriers Failure Fault Tree. The experts then provided their opinions and confidence levels on the prior probabilities of the basic events, which were then quantified utilizing the IT2FS and combined using the Z-number to reduce the uncertainty of the prior probability. The posterior probability of the critical basic events (CBEs) was obtained using the beta distribution based on recorded data on their requirements and failure rates over five years. This information was then fed into the BN. Updating the BN allowed calculating the posterior probability of barrier failure and consequences. Spherical tanks were used as a case study to demonstrate and confirm the significant benefits of the methodology. The results indicated that the overall posterior probability of Consequences after the failure probability of barriers displayed an upward trend over the 5-year period. This rise in IT2FS-Z calculation outcomes exhibited a shallower slope compared to the IT2FS mode, attributed to the impact of experts' confidence levels in the IT2FS-Z mode. These differences became more evident by considering the 10-4 variance compared to the 10-5. This study offers industry managers a more comprehensive and reliable understanding of achieving the most effective accident prevention performance.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。