The environmental price tag on a ton of mountaintop removal coal

一吨山顶爆破煤炭的环境代价

阅读:1

Abstract

While several thousand square kilometers of land area have been subject to surface mining in the Central Appalachians, no reliable estimate exists for how much coal is produced per unit landscape disturbance. We provide this estimate using regional satellite-derived mine delineations and historical county-level coal production data for the period 1985-2005, and further relate the aerial extent of mining disturbance to stream impairment and loss of ecosystem carbon sequestration potential. To meet current US coal demands, an area the size of Washington DC would need to be mined every 81 days. A one-year supply of coal would result in ∼2,300 km of stream impairment and a loss of ecosystem carbon sequestration capacity comparable to the global warming potential of >33,000 US homes. For the first time, the environmental impacts of surface coal mining can be directly scaled with coal production rates.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。