Machine learning approach for predicting production delays: a quarry company case study

利用机器学习方法预测生产延误:以采石场公司为例

阅读:1

Abstract

Predictive maintenance employing machine learning techniques and big data analytics is a benefit to the industrial business in the Industry 4.0 era. Companies, on the other hand, have difficulties as they move from reactive to predictive manufacturing processes. The purpose of this paper is to demonstrate how data analytics and machine learning approaches may be utilized to predict production delays in a quarry firm as a case study. The dataset contains production records for six months, with a total of 20 columns for each production record for two machines. Cross Industry Standard Process for Data Mining approach is followed to build the machine learning models. Five predictive models were created using machine learning algorithms such as Decision Tree, Neural Network, Random Forest, Nave Bayes and Logistic Regression. The results show that Multilayer Perceptron Neural Network and Logistic Regression outperform other techniques and accurately predicts production delays with a F-measure score of 0.973. The quarry company's improved decision-making reducing potential production line delays demonstrates the value of this study.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。