Study on artificial reinforced concrete roof's thickness for subsequent backfilling method in fragmented rock mass deposits

碎石质岩体堆积中人工钢筋混凝土顶板厚度及其后续回填方法的研究

阅读:1

Abstract

In response to issues such as roof collapse during the mining process of fragmented rock mass deposits, the application of artificial reinforced concrete roofs (ARCRs) combined with an effective roof-contact filling (RCF) method is considered for open stope mining with subsequent backfilling. The fragmented ore body in the Jinshandian Iron Mine is taken as the background. The thin plate model and simply supported beam model are combined to calculate the reasonable thickness range of the ARCR. Additionally, FLAC3D numerical simulations are adopted to investigate the stope stability under different thicknesses of ARCRs and various RCF conditions at the optimal ARCR's thickness. The combined theoretical analysis and numerical simulation results indicate that: (1) The safe thickness of the ARCR is 4-5 m, which ensures good stability of the artificial roof. (2) The RCF by expansive backfill (EB) can significantly improve the stability and stress distribution of the stope, reduce stress concentration, and minimize roof settlement and floor heaving. (3) The EB provides reverse support force through expansive stress, effectively controlling the compressive stress on the artificial roof and enhancing overall support performance. The research results could provide a theoretical basis for the safe and efficient mining of deep fragmented rock mass deposits.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。