Study on construction mechanic characteristics and construction optimization of super-large cross-section tunnel portal under shallow buried depth and asymmetrical loading: A case study in Southwest China

浅埋深度和非对称荷载作用下超大断面隧道洞口施工力学特性及施工优化研究:以西南地区为例

阅读:1

Abstract

The excavation of the super-large cross-section tunnel portal section is prone to causing serious engineering distresses. The key factors to ensure the safe construction of portal section are to clarify the construction mechanic characteristics and select a reasonable construction scheme. In this paper, a bidirectional six-lane expressway tunnel in Southwest China was selected as an engineering case. Three excavation schemes, namely, the three-bench seven-step excavation method (TEM), the central diaphragm method (CDM), and the double side drift method (DSDM), were compared and analyzed. Findings revealed that due to the effect of the asymmetrically loaded and super-large cross-section, the surrounding rock deformation and supporting structure stress at the deep buried side were greater than those at the shallow buried side. The CDM and DSDM could reduce the tunnel span and provide temporary support in time, which could effectively control the surrounding rock deformation and improve the structural stress and the slope stability. According to the topographic condition, the excavation sequence of the DSDM was optimized. Excavating the shallow buried side drift first could alleviate the surrounding rock deformation and improve the slope stability in the early stage of construction. Finally, the optimal excavation scheme was successfully implemented.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。