Coupled CFD-DEM simulation of progressive failure of tunnel face in sand

砂土隧道掌子面渐进破坏的CFD-DEM耦合模拟

阅读:1

Abstract

Many studies have investigated tunnel face failure using the discrete element method (DEM). However, DEM simulations that incorporate water-soil interactions in tunnel face failure are still limited. In this study, the coupled CFD-DEM method is employed to simulate the progressive failure of the shield tunnel face in both saturated and dry sand. The dynamic mesh method is applied in the CFD component to accurately simulate the changes in the CFD domain due to the movement of the tunnel face. The excavation face is moved forward or backward at a uniform rate to simulate passive and active failure, respectively. The analysis focuses on progressive failure, ground surface displacement, tunnel face support forces, force chain distribution, and vertical stress distribution. Our results at both macro- and micro-scales reveal significant effects of soil-water interactions.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。