Delay Compensation in a Feeder-Conveyor System Using the Smith Predictor: A Case Study in an Iron Ore Processing Plant

利用史密斯预测器对给料输送机系统进行延迟补偿:以铁矿石加工厂为例

阅读:1

Abstract

Conveyor belts serve as the primary mode of ore transportation in mineral processing plants. Feeders, comprised of shorter conveyors, regulate the material flow from silos to longer conveyor belts by adjusting their velocity. This velocity manipulation is facilitated by automatic controllers that gauge the material weight on the conveyor using scales. However, due to positioning constraints of these scales, a notable delay ensues between measurement and the adjustment of the feeder speed. This dead time poses a significant challenge in control design, aiming to prevent oscillations in material levels on the conveyor belt. This paper contributes in two key areas: firstly, through a simulation-based comparison of various control techniques addressing this issue across diverse scenarios; secondly, by implementing the Smith predictor solution in an operational plant and contrasting its performance with that of a single PID controller. Evaluation spans both the transient flow rate during step change setpoints and a month-long assessment. The experimental results reveal a notable increase in production by 355 t/h and a substantial reduction in flow rate oscillations on the conveyor belt, evidenced by a 55% decrease in the standard deviation.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。