Modeling Al-Qaraqoul canal before and after rehabilitation using HEC-RAS

利用HEC-RAS对Al-Qaraqoul运河修复前后进行建模

阅读:1

Abstract

The Egyptian Ministry of Water Resources and Irrigation launched in 2020 the national project to rehabilitate the canals network to rationalize the use of water resources to face the scarcity problems. The aim of study is to evaluate the impact of canal rehabilitation on the performance of irrigation water delivered laterally to Mesqa's and longitudinally to the end of canal. Qaraqoul Canal et al.-Mallah Area, Alexandria, Egypt, was modeled using Hydrologic Engineering Center's-River Analysis System (HEC-RAS) to simulate water levels in the canal before and after rehabilitation using four discharge scenarios: 1.82, 3.7, 2.2, 7.87 m(3)/s. The calibration before rehabilitation shows that HEC-RAS simulated water levels corresponding to a discharge of 2.2 m(3)/s were in a good agreement with the actual field measured water levels. HEC-RAS results demonstrated that rehabilitation hydraulically improved the efficiency and performance of water conveyed by the canal. On the other hand, second scenario can be considered as suitable to keep water to reach the canal downstream with minimum suitable discharge, providing the need of two emergency pumps at last two branch canals called Mesqa's. An ideal cross-section is also simulated using HEC-RAS which produced an efficient alternative with 40% less cost than the constructed alternative.

特别声明

1、本页面内容包含部分的内容是基于公开信息的合理引用;引用内容仅为补充信息,不代表本站立场。

2、若认为本页面引用内容涉及侵权,请及时与本站联系,我们将第一时间处理。

3、其他媒体/个人如需使用本页面原创内容,需注明“来源:[生知库]”并获得授权;使用引用内容的,需自行联系原作者获得许可。

4、投稿及合作请联系:info@biocloudy.com。